|
|
|
|
|
|
|
|
Overview
|
|
Unitech has latest real estate project in Gurgaon is Uniworld Garden Phase II, a
13 acre development on the Sohna Road Designed by renowned British architect firm
RMJM, this development seeks to create a living space that will be interspersed
with plenty of greenery, to ensure a healthy and soothing lifestyle. Uniworld Garden
Phase II is surrounded by several other real estate and commercial projects by the
Unitech group, like Nirvana Country, Uniworld Resorts, Uni Techworld and more. The
World Spa,Signature Millennium Shikshantar School are also in the vicinity. The
development offers 2 and 3 BHK apartments ranging between 937 and 1335 sq ft. and
the developer has offered an introductory discount of Rs 250 per sq ft, which means
that the apartments at this development are now available at a lucrative Rs 2995
per sq ft.
Special Features
- 2 and 3 BHK apartments on 13 acres development
- Apartments designed by renowned
British architect firm RMJM
- Plenty of greenery, landscaping, clubhouse, swimming
pool
- Spa, school and business park nearby
Key Distances
-
Gurgaon main city � 15 min
- Shopping mall � 3 km
- Nearest railway
station � 30 min
Amenities
-
Clubhouse
- Swimming pool
- Gymnasium
- Table tennis
- Snooker
Badminton (indoor)
- Party hall
- Play ground
- Landscaping
- Waterscaping
- Garden
-
Walking tracks, driveways
|
|
|
|
|
Specifications
|
STRUCTURE |
|
Earthquake resistant RCC framed structure on pile foundations
|
|
Flooring
|
|
Living /dining/bedrooms:Wooden flooring in bedrooms, rest vitrified
flooring |
|
Balconies:Ceramic tiles |
|
Common areas & staircase:Marble / hard stone |
|
Lift lobby:Hard stone / vitrified tiles |
|
PAINTING |
|
External:Texture paint |
|
InternalChoice: Oil bound distemper |
|
Lift lobby:Combination of stone & paint |
|
LIFT |
|
One passenger and one service lift to each tower |
|
KITCHEN |
|
Flooring:Ceramic tile flooring |
|
Wall finishes:Selected Ceramic tiles upto 600mm height above
the counter |
|
Kitchen Counter:Granite counter with stainless steel sink
with drain board |
|
DOORS |
|
Internal:Seasoned hardwood frames with European style moulded
shutters |
|
External:Anodized / powder coated glazed aluminium doors |
|
BATHROOM/TOILET FITTINS |
|
Wall:Selected ceramic tiles upto 7’ height |
|
Flooring:Ceramic tile flooring |
|
Fittings:EWC & wash basin in white colour, modern CP
fittings, granite counter, pipelines for geyser |
|
Windows |
|
Aluminium anodized / powder coated windows |
|
ELECTRICAL SUPPLY |
|
Three phase supply with independent meter, copper wiring in concealed
conduits |
|
TELEPHONE |
|
One telephone jack each in living room and master bedroom Intercom
facility to each flat in drawing room |
|
AIR CONDITIONING |
|
A.C. point provision in all bedrooms |
|
TELEVISION |
|
TV Point in living room and master bedroom |
|
WINDOWS |
|
Aluminium anodized / powder coated windows |
|
|
|
All floorplans, sitemap, specifications, amenities, facilities and perspective views
are tentative in nature and are subject to revision |
Price List
|
|
|
W.e.f- 01/03/09 |
|
Basic Sale Price (BSP) |
|
Universal
|
: |
Rs. 3245/- per sq. ft. |
|
International
|
: |
Rs. 3320/- per sq. ft.
|
|
|
|
|
|
Preferential Location Charges (PLC) |
|
For Ground Floor |
: |
Rs.75/- per sq.ft. |
|
For 1st Floor |
: |
Rs. 60/- per sq.ft. |
|
For 2nd Floor |
: |
Rs.40/- per sq.ft. |
|
For Corner/Tail Apartments |
: |
Rs. 40/- per sq.ft. |
|
For Top Floor |
: |
Rs.75/- per sq.ft. |
|
For Landscaping Facing |
: |
Rs.40/- per sq. ft. |
|
Interest Free Maintenance Security Deposit |
: |
Rs. 50/- per sq.ft. |
|
|
|
|
|
Car Parking Space Covered: |
|
Covered |
: |
Rs. 190000/- per parking |
|
Open |
: |
Rs. 115000/- per parking
|
|
Club Membership Registration Charges |
: |
Rs. 40000/- |
- Prices mentioned are inclusive of External Development Charges (EDC) and Infrastructure
Development Charges (IDC) as presently applicable.
- Prices above mentioned are
escalation free.
- Any further increase in EDC and IDC by the Statutory Authorities
shall be borne by the Allottee.
- The Company would pay to the Allottee(s) Rs.5/-
per sq. ft. per month of Super Area for any delay in offering possession of the
Apartment beyond the period of 30 months from the date of execution of the agreement
to sell. Similarly, the allottee(s) would also be liable to pay holding charges
@ Rs. 5/- per sq.ft. per month of Super Area if the allottee(s) fails to take possession
of the Apartment within 30 days from the date of issuance of the notice of possession.
-
The Maintenance Charges on the basis of Super Area of the Apartment as determined
by the Company at the time of offer of possession of the Apartment shall be payable
in advance for a period of two years before the Possession of the Apartment is handed
over to the Allottee(s).
- Parking: One covered car parking is mandatory with
2 Bedroom Apartment.
One covered and One open car parking is mandatory for 3 bedroom
|
|
The above Prices/Payment Plans are subject to revision/withdrawal at any time without
notice at the sole discretion of the Company. |
|
|
|
Payment Plans |
|
Down Payment Plan |
|
Rebate 10% on Basic Sale Price |
|
At the time of Registration of Application for Allotment
|
:
|
10% of BSP
|
|
Within 45 Days Of the date of Registration
|
:
|
85% of BSP +PLC +Parking+50% of CMRC
|
|
On Notice Of Possession
|
:
|
5% of BSP+50% of CMRC + Stamp duty charges and other charges as applicable
|
|
|
|
|
|
Construction Linked Installment Plan
|
|
At the time of Registration of Application for Allotment 10% of BSP Within 3 months
of allotment |
: |
10%of BSP
|
|
On commencement of construction |
: |
10% of BSP +50% of PLC |
|
#On casting of Ground Floor Roof |
: |
10% BSP + 50% of PLC |
|
On casting of Third Floor Roof |
: |
10% of BSP + 50% of CMRC |
|
On casting of Sixth Floor Roof |
: |
7.5% of BSP+50%OF Parking |
|
On casting of Ninth Floor Roof |
: |
7.5% of BSP+ 50% of Parking |
|
On casting of Eleventh Floor Roof
|
: |
7.5% of BSP+ 50% of Parking |
|
On casting of Top Floor Roof |
: |
7.5% of BSP 7.5% of BSP
|
|
On completion of masonry work in the apartment |
: |
5% of BSP |
|
On completion of internal plaster within the apartment |
: |
5% of BSP |
|
On completion of flooring within apartment
|
:
|
5% of BSP
|
|
On notice of possession
|
:
|
5% of BSP + 50% of CMRC+ Stamp duty charges and any other charges as applicable
|
|
BSP = Basic Sale Price
|
|
CMRC = Club Membership and Registration Charges |
|
PLC = Preferential Location Charges |
|
Other Charges Include Maintenance Security, Maintenance Charges, Stamp Duty Charges,
Registration Fees and other charges payable as per the agreed terms |
|
|
|
# This installment and installments listed hereunder shall become payable on demand
irrespective of the serial order in which they are listed
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|